RCC have worked with our client on this site for a number of years having first obtained planning permission to covert a large complex of barns to a single dwelling. Unfortunately when converting the southern section of buildings there was a partial collapse and our client undertook a large element of rebuilding without informing the council.
Following an enforcement investigation RCC were contacted again to reviews options to obtain retrospective planning permission for all of the buildings. This was always going to be a difficult ask as the site was in the countryside where a new build dwelling wouldn't be allowed. We did however present a strong case and got support from the local councillor which meant we were at least able to present our case directly to the planning committee. Sadly the application was ultimately refused by the planning committee.
At this point we could have advised our client to use their right of appeal to the Planning Inspectorate but our view was that the chances of success were too low. Instead we advised that we should to looking to secure permission for a reduced scheme that includes the one barn that was actually converted plus a further barn that was rebuilt at the same size of the barn demolished. This would still give us the change of securing permission was a large dwelling on the site.
Informal negotiations with the planning officer allowed us to seek guidance on what would now be supported and we used a number of options as part of the negotiations. During this period we did add a further section of new build to allow us to create ecological mitigation (the building had started to be uses by bats when the development was paused). The resulting scheme is shown on the extract above.
We submitted the negotiated reduced scheme and the planning officer was able to support the proposal with no objections being received. The final hurdle was a Section 106 Planning Legal Agreement to secure Nutrient Neutrality mitigation (something we were able to do on land our client owned) and this agreement has finally been signed and the planning permission issued. A huge relief to RCC and our client.